Office Relocation Checklist: Our Top Considerations

Relocating to a new workspace is a major corporate milestone. Whether your business is expanding, adapting to hybrid working models, or approaching a lease expiry, moving into a new property offers a valuable opportunity to rethink how your team operates.

Without a structured plan, however, an office move can cause unnecessary downtime and operational disruption. To keep your business running smoothly, we have compiled the ultimate master checklist, breaking the relocation process down into simple, chronological phases.

Phase 1: Strategy, Budget & Space Planning (6–12 Months Out)

Before reviewing physical properties, define your corporate objectives and financial boundaries.

  • Define Business Objectives: Determine whether the new space needs to support rapid staff growth, client-facing hospitality, or hybrid working configurations.
  • Establish a CAPEX Budget: Calculate all relocation costs—including fit-out fees, legal expenses, logistics, new furniture, and IT infrastructure.
  • Set a Contingency Fund: Set aside 10–15% of your total budget for unforeseen building works or utility connection delays.
  • Audit Space Requirements: Calculate the required overall square footage, taking into account workstations, meeting suites, breakout zones, and storage.
Phase 2: Property Selection & Location Audit (4–8 Months Out)

Phase 2: Property Selection & Location Audit (4–8 Months Out)

Phase 2: Property Selection & Location Audit (4–8 Months Out)

Location directly impacts employee retention and daily operational logistics. Evaluate each prospective site against critical infrastructure standards:

  • Commute & Accessibility: Check proximity to major rail links, bus routes, and arterial roads. Ensure there is adequate parking for staff and visitors.
  • Local Amenities: Assess nearby food options, coffee shops, and facilities where staff can take breaks or host clients.
  • Building Energy Efficiency: Review the building’s Energy Performance Certificate (EPC). High energy efficiency lowers long-term operational overheads.
  • Statutory Compliance: Verify that the premises comply with current accessibility legislation (including the Equality Act 2010) and fire safety codes.
  • Acoustics & Natural Light: Inspect the level of natural daylight and evaluate environmental noise from nearby transport corridors or industrial activity.

Phase 3: Legal Terms & Lease Negotiations (3–6 Months Out)

Work closely with your commercial property agent and solicitor to finalise lease agreements before construction begins:

  • Lease Terms & Break Clauses: Negotiate flexible lease lengths and formal break clauses to protect your business against future market shifts.
  • Rent-Free Periods: Secure rent-free incentives to offset initial fit-out costs and construction delays.
  • Dilapidations Protocols: Agree on clear dilapidations terms for your existing workspace to avoid unexpected exit costs from your outgoing landlord.

Phase 4: IT Infrastructure & Workspace Fit-Out (2–4 Months Out)

IT connectivity and physical layout are the most critical factors in preventing opening-day disruption.

  • Data & Connectivity: Confirm fibre-optic broadband availability early. Order internet connections and data lines well in advance to avoid lead-time delays.
  • Server & Comms Rooms: Determine position, climate control, and security requirements for your primary data infrastructure.
  • Design & Layout Finalisation: Work alongside your design and build partner to approve 3D space plans, electrical layouts, lighting configurations, and furniture selection.
Phase 4: IT Infrastructure & Workspace Fit-Out (2–4 Months Out)

Phase 5: Staff Preparation & Logistics (1–2 Months Out)

Clear communication minimizes anxiety and keeps productivity high during the transition.

  • Appoint a Move Manager: Designate a single internal point of contact to coordinate with your design & build team and manage staff queries.
  • Phased Transition Strategy: If possible, move teams across in structured phases to keep core operations running without full downtime.
  • Site Orientation & Safety Induction: Provide your staff with visual previews, travel guides, and new building safety protocols ahead of moving day.
  • Temporary Work Solutions: Arrange remote or hybrid working schedules during the final physical move-in weekend to keep staff clear of active logistics.

Phase 6: Final Testing, Snagging & Handover

Before welcoming your full team into the new workspace:

  • System Testing: Test all IT networks, power outlets, AV systems, heating/cooling controls, and security access points.
  • Snagging Walkthrough: Complete a detailed walkthrough with your contractor to identify and resolve minor cosmetic touch-ups.
  • O&M Manual Delivery: Ensure you receive complete Operation & Maintenance (O&M) documentation and statutory compliance sign-offs.
Content Image

Streamline Your Office Relocation with Oaktree

Managing an office move doesn't have to be overwhelming. With 30 years of industry-leading experience, Oaktree Interiors manages every technical detail of your workspace transformation: from initial space audits to construction and final handover.

Book a Free Workspace Consultation
Back To Top
hello@oaktreeoffice.com
whatsapp