All areas of the building were modernised and refurbished to a high standard. We created a new canteen and installed changing facilities for the factory and warehouse staff. New carpet and vinyl flooring were laid throughout. We also supplied new furniture throughout the building.
A new heating, cooling and ventilation system was installed throughout, as well as a complete re-wire of all electrical and data infrastructure, new lighting, and a new communications room, with links needed between the offices, warehouse, and the mill.
The newly formed corridors were created as ‘curved’ walkways, built predominantly from full-height glass and solid doors, enhanced with the installation of bulkheads above, giving a modern and contemporary look. The boardroom/training areas were created with moveable, folding partition walls.
We created a new breakout area between the open-plan office and meeting rooms, providing a natural sound barrier, whilst also being easily accessible to both staff and visitors